Delivery planning, dispatch, driver execution, and reporting in one platform

Run the whole delivery day
from planning desk to proof of delivery.

Trackely gives logistics teams one operating system for draft routes, live dispatch, driver progress, POD, exceptions, compliance, analytics, telematics, and enterprise controls. Fewer disconnected tools, more control over the day.

Draft route planning and optimisationLive dispatch map and route recoveryDriver app with proof of deliveryExceptions, compliance, and audit history

7-day trial · No card required · Guided setup available · UK support

One workspace
Plan to proof
Built for
UK delivery teams
Go live
Start in days
Trackely planning workspace showing route list, live map, and route cost breakdown

Why teams change

Most operators do not need another routing widget.

They need one system that helps them plan the work, publish the routes, recover the day when things move, prove what happened, and report on the outcome afterwards.

Dispatchers are juggling spreadsheets, maps, chat threads, and driver calls just to keep the day moving.

Routes go out looking fine, then exceptions, late ETAs, and reassignment requests hit with no shared control tower.

Cost, workload imbalance, compliance risk, and service issues only become visible after the route has already failed.

Customer updates, POD, depot context, and audit evidence live in separate tools instead of one operating record.

How it works

One system for the whole delivery lifecycle.

From route planning to live recovery to final proof and reporting, the workflow stays connected.

01

Plan in draft

Import orders, build route drafts, and review route quality before anything is published. Routes, map context, cost, workload, and planning detail stay together.

  • Import work from CSV and manage customers, depots, vehicles, and drivers in-platform
  • See draft routes, unplanned work, clustering, and route health in one workspace
  • Review cost, mileage, stop density, and assignment readiness before dispatch
02

Dispatch and recover

Assign drivers and vehicles, publish when ready, and manage the live day from the dispatch map. Reoptimise, rebalance, and respond to exceptions without losing control of the record.

  • Draft and publish workflow with route detail and map context side by side
  • Live route status, ETA awareness, operations exceptions, and customer risk workflows
  • Copilot-assisted actions and controlled confirmation flows
03

Execute, prove, and report

Drivers complete the route from the mobile app while the office tracks progress, proof, incidents, and follow-up actions. The same operating data then powers reporting and compliance.

  • Driver app for route progress, arrivals, stop completion, issues, and daily checks
  • Proof of delivery with photo, signature, notes, and stop-level timeline history
  • Analytics, finance, sustainability, compliance, and audit logs from the same data

Why Trackely

Not another dispatch board.

Plenty of tools solve one slice of the problem. Trackely is for the team that has to plan the work, run the day, handle exceptions, and prove the outcome in one place.

Planning, dispatch, and execution stay connected

The route plan does not disappear once the vans leave. Draft routes, live map activity, driver completion, and follow-up actions stay in one workflow.

Operational detail is first-class

Depots, vehicles, telematics, POD, exceptions, customer communication, and audit history are part of the operating model instead of afterthoughts.

Copilot helps, but humans stay in control

AI-assisted actions can prepare route changes, record updates, and operational suggestions with confirmation instead of silently mutating the day.

Built for accountability

Trackely is designed for teams that need route health, compliance, cost visibility, and a clear record of what changed, when, and why.

How Trackely compares

FeatureTrackelyOther tools
Planning + dispatch + driver execution in one product
UK-native postcodes & routingMany tools are built around US zip codes and adapted later
GBP pricing with no FX surprises
Draft route cost and route health before dispatch
Live map, route exceptions, and recovery workflow
Driver workload and assignment balancing
AI-assisted planning and operations actions
Proof of delivery and audit trail
Compliance, sustainability, and finance reporting
Flat monthly pricing, no per-API billing

Based on publicly available information about common alternatives. Features may vary by plan or region.

Product view

The office view and the driver view stay aligned.

Dispatch sees the operating picture. Drivers see exactly what they need to execute the route. Both sides are working from the same delivery record.

Planning workspace
Draft routes, route quality, cost breakdown, map context, assignments, and action-ready operational detail in one view.
Trackely route detail panel showing cost per drop, fuel estimate, delivery sequence, and optimisation results
Driver app
Current stop, progress, issue handling, and proof of delivery on the driver's phone.
Trackely driver mobile app showing current stop, route progress, and upcoming delivery stops

Built for operators

Made for real distribution businesses, not generic route demos.

Trackely is designed for UK delivery operators who need more than route optimisation alone. The platform is built around planning desks, live dispatch pressure, driver execution, and the reporting burden that follows every delivery day.

That means UK postcodes, GBP pricing, audit history, compliance tooling, and a product surface that can grow from daily planning into broader operational control.

UK-first
Routing, postcodes, pricing, and operating assumptions built around UK delivery teams.
Operations-grade
Planning, dispatch, driver progress, proof, exceptions, and reporting connected in one operating record.
Audit-ready
Route changes, driver assignments, stop outcomes, and exceptions tracked with clear history.
GDPR-conscious
Data handling and operational workflows designed with UK and EU expectations in mind.
Honest pricing
Flat monthly pricing in GBP, without hidden per-route or per-map-call surprises for normal usage.

Questions

Common questions

Anything not covered here? Get in touch and we'll get back to you quickly.

Most teams can get from import to draft routes on day one. You can add drivers, vehicles, depots, and customers, import work from CSV, and start planning without a heavyweight implementation project.

Ready when you are

Upgrade the whole delivery operation.

Bring planning, dispatch, driver execution, proof of delivery, and reporting into one workflow your team can actually run every day.

Start with a trial or book a walkthrough with your current process in hand · See full pricing

No credit card · Guided setup available · UK-based support